In 2019, a 20 m³/hour capacity Industrial Wastewater Treatment Plant was built for EAE A.S., located in Dilovası. The project included the design and engineering of the treatment unit, procurement of mechanical equipment, installation, and commissioning of the plant. The treatment process used was a continuous chemical treatment process that involved balancing the pH level and removing pollutants using chemicals, followed by a sludge dewatering process to remove excess water from the treated sludge. The plant also included an aeration system to maintain the oxygen level in the treatment process.